{"id":78707,"date":"2026-06-24T17:08:00","date_gmt":"2026-06-24T17:08:00","guid":{"rendered":"http:\/\/bangla.sitestree.com\/?p=78707"},"modified":"2026-06-24T17:08:01","modified_gmt":"2026-06-24T17:08:01","slug":"sprint","status":"publish","type":"post","link":"http:\/\/bangla.sitestree.com\/?p=78707","title":{"rendered":"Sprint"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Sprint length \/ iteration length by methodology<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Methodology<\/th><th>Correct term<\/th><th>Typical length<\/th><th>Explanation<\/th><\/tr><\/thead><tbody><tr><td><strong>Agile<\/strong><\/td><td>Iteration \/ sprint, depending on framework<\/td><td>Usually <strong>1\u20134 weeks<\/strong><\/td><td>Agile is a broad mindset, not one fixed process. Different Agile frameworks use different time-boxes.<\/td><\/tr><tr><td><strong>Scrum<\/strong><\/td><td><strong>Sprint<\/strong><\/td><td>Usually <strong>1\u20134 weeks<\/strong><\/td><td>Scrum uses a fixed-length sprint to plan, build, review, and improve. Your slides define a sprint as a time-boxed period of <strong>1\u20134 weeks<\/strong> that creates a potentially shippable product increment.<\/td><\/tr><tr><td><strong>XP \/ Extreme Programming<\/strong><\/td><td><strong>Iteration<\/strong><\/td><td>Usually <strong>1\u20132 weeks<\/strong>, sometimes up to 3 weeks<\/td><td>XP uses short iterations to support frequent feedback, continuous integration, testing, refactoring, and small releases.<\/td><\/tr><tr><td><strong>Kanban<\/strong><\/td><td>No sprint required<\/td><td><strong>No fixed sprint length<\/strong><\/td><td>Kanban is based on continuous flow. Work is pulled through the board as capacity becomes available, rather than being planned into fixed sprints. Your slides describe Kanban as continuous flow with no fixed iterations.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Simple explanation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A <strong>sprint<\/strong> is a fixed time-box used mainly in <strong>Scrum<\/strong>. For example, a team may choose a <strong>2-week sprint<\/strong>. At the beginning, they plan the work. During the sprint, they execute and track progress. At the end, they review the completed increment and hold a retrospective.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In <strong>XP<\/strong>, the idea is similar, but the term <strong>iteration<\/strong> is more common. XP iterations are usually short because XP emphasizes quick feedback, frequent releases, testing, and continuous improvement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In <strong>Kanban<\/strong>, there is normally <strong>no sprint length<\/strong> because work flows continuously. Instead of saying, \u201cWhat can we finish in the next two weeks?\u201d, a Kanban team asks, \u201cWhat is the next highest-priority item we can pull now, based on available capacity and WIP limits?\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For students, you can say:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Scrum works in fixed sprints. XP works in short iterations. Kanban works in continuous flow. Agile is the umbrella concept that can include all of these approaches.<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">WIP Limits:<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WIP limits<\/strong> means <strong>Work-In-Progress limits<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Kanban, a WIP limit sets the <strong>maximum number of work items allowed in one workflow stage at the same time<\/strong>. For example, a team may decide that only <strong>3 user stories<\/strong> can be in <strong>In Progress<\/strong> at once. Your slides define WIP limits as a constraint-based approach used to optimize flow and prevent overloading the team.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td><strong>Term<\/strong><\/td><td><strong>Meaning<\/strong><\/td><\/tr><\/thead><tbody><tr><td><strong>WIP<\/strong><\/td><td>Work currently started but not yet finished<\/td><\/tr><tr><td><strong>WIP Limit<\/strong><\/td><td>Maximum number of items allowed in a stage<\/td><\/tr><tr><td><strong>Purpose<\/strong><\/td><td>Prevent too much work from being started at once<\/td><\/tr><tr><td><strong>Benefit<\/strong><\/td><td>Helps reveal bottlenecks and improves delivery speed<\/td><\/tr><tr><td><strong>Common Kanban columns<\/strong><\/td><td>Backlog \u2192 To Do \u2192 In Progress \u2192 Review\/Testing \u2192 Done<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Example:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td><strong>Kanban Column<\/strong><\/td><td><strong>WIP Limit<\/strong><\/td><td><strong>Meaning<\/strong><\/td><\/tr><\/thead><tbody><tr><td>To Do<\/td><td>No limit<\/td><td>Work waiting to be started<\/td><\/tr><tr><td>In Progress<\/td><td>3<\/td><td>Only 3 items can be actively worked on<\/td><\/tr><tr><td>Review \/ Testing<\/td><td>2<\/td><td>Only 2 items can wait for review\/testing<\/td><\/tr><tr><td>Done<\/td><td>No limit<\/td><td>Completed work<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Simple explanation:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">WIP limits stop the team from starting too many things at the same time. Instead of everyone beginning new tasks, the team focuses on finishing existing work first.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What the action looks like:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A team has 3 stories already in <strong>In Progress<\/strong>, and the WIP limit is 3. A developer cannot pull another story into <strong>In Progress<\/strong> until one of the current stories moves to <strong>Review<\/strong> or <strong>Done<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This helps the team ask:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWhy is work stuck here?\u201d<br>\u201cDo we need to help finish current work before starting new work?\u201d<br>\u201cIs testing or review becoming a bottleneck?\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Jira or a Kanban board, WIP limits usually appear as a number on top of a column, such as:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>In Progress 3\/3<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That means the column is full. The team should finish or move existing work before starting more.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sprint length \/ iteration length by methodology Methodology Correct term Typical length Explanation Agile Iteration \/ sprint, depending on framework Usually 1\u20134 weeks Agile is a broad mindset, not one fixed process. Different Agile frameworks use different time-boxes. Scrum Sprint Usually 1\u20134 weeks Scrum uses a fixed-length sprint to plan, build, review, and improve. Your &hellip; <\/p>\n<p><a class=\"more-link btn\" href=\"http:\/\/bangla.sitestree.com\/?p=78707\">Continue reading<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[1982],"tags":[],"class_list":["post-78707","post","type-post","status-publish","format-standard","hentry","category-project-management-general","item-wrap"],"jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":78765,"url":"http:\/\/bangla.sitestree.com\/?p=78765","url_meta":{"origin":78707,"position":0},"title":"Scrum board vs Kanban board","author":"Sayed","date":"July 12, 2026","format":false,"excerpt":"A Scrum board and a Kanban board may look similar, but they manage work differently. AreaScrum boardKanban boardWork cycleWork is organized into fixed-length sprintsWork moves continuouslyBoard scopeUsually shows work selected for the current sprintShows the ongoing workflowPlanningSprint Planning selects work before the sprint beginsWork is pulled when capacity becomes availableChangesSprint\u2026","rel":"","context":"In &quot;Agile | \u098f\u099c\u09be\u0987\u09b2&quot;","block_context":{"text":"Agile | \u098f\u099c\u09be\u0987\u09b2","link":"http:\/\/bangla.sitestree.com\/?cat=1661"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":78713,"url":"http:\/\/bangla.sitestree.com\/?p=78713","url_meta":{"origin":78707,"position":1},"title":"Scrum events, XP events, Kanaban Events, Agile Events","author":"Sayed","date":"June 24, 2026","format":false,"excerpt":"From AI Tools\/ChatGPT as is: Key idea Scrum has formal events.XP has practices\/activities more than formal events.Kanban has cadences\/meetings, not required sprints.Agile itself is an umbrella approach, so it does not prescribe one fixed set of events. Your Scrum slides identify the five Scrum events as Sprint, Sprint Planning, Daily\u2026","rel":"","context":"In &quot;Project Management : General&quot;","block_context":{"text":"Project Management : General","link":"http:\/\/bangla.sitestree.com\/?cat=1982"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":78738,"url":"http:\/\/bangla.sitestree.com\/?p=78738","url_meta":{"origin":78707,"position":2},"title":"Burndown chart what is on x axis? sprint or day?","author":"sayedjustetc","date":"July 8, 2026","format":false,"excerpt":"For a Sprint Burndown Chart, the x-axis is usually the days inside the sprint. Sprint burndown AxisMeaningX-axisDays of the sprintY-axisRemaining work Example: DayRemaining workDay 1100 pointsDay 285 pointsDay 370 pointsDay 450 pointsDay 525 pointsDay 60 points So for a 2-week sprint, the x-axis may show: Day 1, Day 2, Day\u2026","rel":"","context":"In &quot;Agile | \u098f\u099c\u09be\u0987\u09b2&quot;","block_context":{"text":"Agile | \u098f\u099c\u09be\u0987\u09b2","link":"http:\/\/bangla.sitestree.com\/?cat=1661"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":78771,"url":"http:\/\/bangla.sitestree.com\/?p=78771","url_meta":{"origin":78707,"position":3},"title":"define: Metrics: velocity, sprint burndown","author":"Sayed","date":"July 12, 2026","format":false,"excerpt":"MetricDefinitionWhat it tells usExampleVelocityThe amount of work a team completes in one sprint, usually measured in story points.Helps estimate how much work the team may complete in future sprints.If a team completes 24, 26, and 22 story points over three sprints, average velocity is about 24 points per sprint.Sprint BurndownA\u2026","rel":"","context":"In &quot;Agile | \u098f\u099c\u09be\u0987\u09b2&quot;","block_context":{"text":"Agile | \u098f\u099c\u09be\u0987\u09b2","link":"http:\/\/bangla.sitestree.com\/?cat=1661"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":78711,"url":"http:\/\/bangla.sitestree.com\/?p=78711","url_meta":{"origin":78707,"position":4},"title":"Reflection:","author":"Sayed","date":"June 24, 2026","format":false,"excerpt":"Reflection: Reflection in Agile means the team regularly looks back at how the work went and decides how to improve. In Scrum, the formal event for reflection is the Sprint Retrospective. Sprint Retrospective as one of the five Scrum events, along with Sprint, Sprint Planning, Daily Scrum, and Sprint Review.\u2026","rel":"","context":"In &quot;Project Management : General&quot;","block_context":{"text":"Project Management : General","link":"http:\/\/bangla.sitestree.com\/?cat=1982"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":78763,"url":"http:\/\/bangla.sitestree.com\/?p=78763","url_meta":{"origin":78707,"position":5},"title":"throughput is it used in scrum as a metric or only for kanban","author":"Sayed","date":"July 12, 2026","format":false,"excerpt":"Throughput can be used in Scrum too. It is not only for Kanban. However: Throughput is more strongly associated with Kanban and flow-based systems.Velocity is more commonly used in Scrum. In Kanban Throughput means: Number of work items completed during a period, such as 12 tickets per week. Because Kanban\u2026","rel":"","context":"In &quot;Agile | \u098f\u099c\u09be\u0987\u09b2&quot;","block_context":{"text":"Agile | \u098f\u099c\u09be\u0987\u09b2","link":"http:\/\/bangla.sitestree.com\/?cat=1661"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_featured_media_url":"","_links":{"self":[{"href":"http:\/\/bangla.sitestree.com\/index.php?rest_route=\/wp\/v2\/posts\/78707","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/bangla.sitestree.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/bangla.sitestree.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/bangla.sitestree.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/bangla.sitestree.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=78707"}],"version-history":[{"count":1,"href":"http:\/\/bangla.sitestree.com\/index.php?rest_route=\/wp\/v2\/posts\/78707\/revisions"}],"predecessor-version":[{"id":78708,"href":"http:\/\/bangla.sitestree.com\/index.php?rest_route=\/wp\/v2\/posts\/78707\/revisions\/78708"}],"wp:attachment":[{"href":"http:\/\/bangla.sitestree.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=78707"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/bangla.sitestree.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=78707"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/bangla.sitestree.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=78707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}